JobTread Cost Catalog Template (NAHB Cost Codes)

A ready-to-use JobTread cost catalog template for home builders, built on the NAHB cost code framework: cost groups, cost items, units, and setup.

By Kenneth Muriuki
September 22, 2026
12 min read
Calculator and cost breakdown sheets for a construction budget

This is a ready-to-use JobTread cost catalog template for home builders, structured on the NAHB (National Association of Home Builders) cost code framework. It gives you the cost groups and cost items to build a complete catalog in JobTread, organized in the standard construction sequence every builder recognizes, with a clean numbering scheme you can adapt. Instead of staring at an empty cost catalog, you start from a proven structure and customize it to your business.

A cost catalog is the foundation of everything in JobTread. Estimates pull from it, budgets are built on it, and job costing reconciles against it. Get it structured right and the whole system works; get it wrong and your reports never add up. For the how-and-why of building one, see our JobTread cost catalog setup guide. This page gives you the actual structure to copy.

How JobTread's cost catalog is organized

JobTread uses two levels:

  • Cost groups are the categories (Foundation, Framing, Plumbing). They keep your catalog and your reports organized.
  • Cost items are the specific lines within a group (Footings, Framing Labor, Plumbing Fixtures). Each carries a unit and a cost, and these are what you pull into estimates and budgets.

The template below is organized exactly that way: each cost group is a section, and the table under it lists the cost items, a suggested code, a typical unit, and the usual cost type (Material, Labor, or Subcontract). Units use standard abbreviations: LS (lump sum), EA (each), LF (linear foot), SF (square foot), SQ (roofing square), CY (cubic yard).

The cost catalog template

1000: Preconstruction & Permits

CodeCost ItemUnitType
1010Plans & DesignLSSub
1020Engineering & StructuralLSSub
1030Survey & StakingLSSub
1040Permits & FeesLSSub
1050Impact & Utility FeesLSSub

2000: Site Work & Excavation

CodeCost ItemUnitType
2010Lot Clearing & DemolitionLSSub
2020Excavation & Rough GradingLSSub
2030Erosion ControlLSSub
2040Temporary Utilities & FacilitiesLSSub
2050Fill & CompactionCYSub

3000: Foundation & Concrete

CodeCost ItemUnitType
3010FootingsLFSub
3020Foundation Walls / Stem WallsLFSub
3030Slab & Garage FloorSFSub
3040Waterproofing & DampproofingLSSub
3050Foundation DrainageLFSub
3060Flatwork (Porches, Patios)SFSub

4000: Rough Framing & Structure

CodeCost ItemUnitType
4010Framing Lumber & MaterialsLSMaterial
4020Framing LaborSFLabor
4030Roof TrussesEAMaterial
4040Wall & Roof SheathingSFMaterial
4050Structural Steel & BeamsEASub
4060Exterior Decks & PorchesSFSub

5000: Roofing

CodeCost ItemUnitType
5010Roofing MaterialSQMaterial
5020Roofing LaborSQSub
5030Underlayment & FlashingLSSub
5040Gutters & DownspoutsLFSub

6000: Windows & Exterior Doors

CodeCost ItemUnitType
6010WindowsEAMaterial
6020Exterior DoorsEAMaterial
6030Garage DoorsEASub
6040SkylightsEAMaterial

7000: Exterior Finishes

CodeCost ItemUnitType
7010SidingSFSub
7020Brick & Stone VeneerSFSub
7030StuccoSFSub
7040Exterior Trim, Soffit & FasciaLFSub
7050Exterior Paint & StainSFSub

8000: Plumbing

CodeCost ItemUnitType
8010Plumbing Rough-InLSSub
8020Plumbing FixturesEAMaterial
8030Water HeaterEASub
8040Well & SepticLSSub

9000: Electrical

CodeCost ItemUnitType
9010Electrical Rough-InLSSub
9020Fixtures & DevicesEAMaterial
9030Panel & ServiceLSSub
9040Low-Voltage & DataLSSub

10000: HVAC

CodeCost ItemUnitType
10010HVAC EquipmentEAMaterial
10020DuctworkLSSub
10030HVAC Rough-In & LaborLSSub
10040VentilationLSSub

11000: Insulation

CodeCost ItemUnitType
11010Wall & Attic InsulationSFSub
11020Air SealingLSSub
11030Spray FoamSFSub

12000: Drywall

CodeCost ItemUnitType
12010Drywall HangSFSub
12020Drywall Finish & TapeSFSub
12030TextureSFSub

13000: Interior Trim & Millwork

CodeCost ItemUnitType
13010Interior DoorsEAMaterial
13020Casing & Base TrimLFMaterial
13030Trim LaborLSLabor
13040Stairs & RailingsLSSub
13050Closet & Pantry ShelvingLSSub

14000: Cabinets & Countertops

CodeCost ItemUnitType
14010Kitchen CabinetsLFMaterial
14020Bath VanitiesEAMaterial
14030CountertopsSFSub
14040Cabinet HardwareEAMaterial

15000: Painting

CodeCost ItemUnitType
15010Interior PaintSFSub
15020StainingLSSub

16000: Flooring

CodeCost ItemUnitType
16010TileSFSub
16020HardwoodSFSub
16030CarpetSFSub
16040LVP & LaminateSFSub
16050Floor Prep & UnderlaymentSFSub

17000: Appliances & Fixtures

CodeCost ItemUnitType
17010AppliancesEAMaterial
17020Bath AccessoriesEAMaterial
17030Mirrors & Shower DoorsEASub

18000: Specialties

CodeCost ItemUnitType
18010FireplaceEASub
18020Garage & Storage SystemsLSSub
18030Window TreatmentsLSSub
18040Security & Smart HomeLSSub

19000: Landscaping & Site Improvements

CodeCost ItemUnitType
19010Final GradeLSSub
19020Driveway & WalksSFSub
19030Sod & LandscapingLSSub
19040FencingLFSub
19050IrrigationLSSub

20000: Final Cleaning & Completion

CodeCost ItemUnitType
20010Rough CleanLSSub
20020Final CleanLSSub
20030Punch ListLSLabor
20040Warranty ReserveLSLabor

21000: General Conditions & Overhead

CodeCost ItemUnitType
21010Supervision & Project ManagementLSLabor
21020Dumpster & Waste RemovalEASub
21030Portable ToiletEASub
21040Temporary PowerLSSub
21050Insurance & General LiabilityLSLabor

How to set this up in JobTread

Build it in this order so the structure holds:

  1. Create the cost groups first. Add each numbered group (Preconstruction, Site Work, Foundation, and so on) as a cost group in JobTread. This gives you the skeleton.
  2. Add cost items under each group. Enter the items from each table, setting the unit and cost type as you go.
  3. Set your real costs. Add your actual unit costs, updating them over time as you complete jobs and learn your true numbers.
  4. Build templates on top. Once the catalog is in place, your estimate templates pull from it, which is what makes estimating fast. See the estimating workflow guide.

The JobTread cost catalog setup guide walks the mechanics in detail.

Customizing it for your business

Treat this as a starting structure, not a finished catalog:

  • Trim what you do not do. A remodeler will drop foundation-heavy items; a production builder will expand them. See JobTread for remodelers for a remodeling-leaning view.
  • Add your specialties. Whatever is specific to your trade, region, or product line belongs in here.
  • Rename to your language. Use the terms your team actually says on the job.
  • Keep the structure and sequence. The group order matters for clean reporting. Adjust the contents, not the framework.

The goal is a catalog that reflects how you actually build, sitting on a structure that keeps your job costing and reports consistent.

Want it built for you?

Setting up a full cost catalog and getting it right is one of the most valuable, and most tedious, parts of a JobTread implementation. This template gives you the structure; building it out with your real items and costs, then connecting it to estimating and QuickBooks, is where a proper setup pays off.

That is exactly what we do. If you want your JobTread cost catalog built around how you actually build, tell us about your business and we will set it up, or have a JobTread virtual assistant keep it current for you. Get in touch and we will map it.

Free download

Get the JobTread Cost Catalog Template (CSV)

Enter your email and we will send you the full template as a CSV, ready to reference or import into JobTread. No spam, no sales sequence.

jobtread cost catalog templatejobtread cost codes templatenahb cost codes jobtreadconstruction cost codes templatejobtread cost catalog

Related service

JobTread Implementation Experts & Ongoing Support

Work with a JobTread implementation expert to configure the system, train the team, and support adoption.

Kenneth Muriuki, Construction PM & Construction Tech Expert

Written by

Kenneth Muriuki

Construction PM & Construction Tech Expert

Kenneth is a construction project manager and construction technology expert who specializes in JobTread implementation, with experience helping contractors improve project delivery, system configuration, reporting, and operational visibility. He writes about practical construction technology, workflow design, and the operating disciplines that help teams deliver work consistently.

More articles

Construction Tech Implementation

AI for the Construction Back Office: What to Hand Off

AI for construction admin, task by task: AP coding, PO matching, lien waivers, COIs and pay apps. What AI does well, what needs a human, and what stays out.

Read
Construction Tech Implementation

AI for Construction Project Management: 8 PM Workflows

AI for construction project management, workflow by workflow: RFIs, submittals, minutes, daily reports, change orders, schedules, and where PMs must check.

Read
Construction Tech Implementation

AI Tools for Contractors: An Honest 2026 Buyer's Guide

The AI tools for contractors worth paying for in 2026, sorted by the job they do: assistants, takeoff, document review, field capture, scheduling, and sales.

Read

Need help implementing this?

Tell us the workflow you want to fix and we will scope the right support.